Red Bud Lane South-Evergreen Drive to Gattis School Road
This project upgrades an existing 2-lane roadway to a new 5 lane divided arterial roadway with continuous left turn lane.
The City held public meeting on July 28, 2020, to share the preliminary design plans and hear feedback from the community. The materials shared at the public meeting and the meeting report including responses to public comment are available below. To view the preliminary schematic please click the “view project map” at the top of the page.
Design is complete. Utility relocation and Right-of-Way (ROW) must be completed before construction on the project can begin. Bid is scheduled for late 2025 with construction to follow in early 2026.
Public Meeting Materials:
Bid Phase – late 2025
Transportation
LJA Engineering
Dawn Scheel
512-218-6603