Downtown Park at Brushy Creek Project

About the Project

Round Rock City Council unanimously approved the design of a master plan for more park land and trail connectivity in Downtown Round Rock on March 9, 2023. The $277,834 contract with design firm Design Workshop will include design of a proposed project situated along Brushy Creek on the north side of Downtown Round Rock. Round Rock officials have acquired several pieces of land to build the proposed park and tie the future Heritage Trail to Sheppard Street/Dr. Martin Luther King Jr. Way to bring pedestrians and cyclists into Downtown. The proposed project is expected to also give officials the opportunity to address stormwater issues in the area.

Note: The floodplain above is a future land donation, and does not include any land outside of the floodplain.

Public Input

An open house to gather feedback from the public on the project took place on April 18 at the Baca Center. Below are links to materials presented at the meeting:

Project Intro Boards
Analysis Boards
Inspiration Boards
Project Goals Boards

An online survey was also made available for residents to give their feedback on the project.

Project Funding

Funding for the design of the master plan will come from the City’s general self-financed construction fund. The construction of the Downtown park at Brushy Creek was one of the proposed projects outlined in the Parks, Recreation and Sports proposition in the City’s May 6, 2023 bond election. Learn more about the election at roundrocktexas.gov/bond.

Scroll to Top