Basins LC09Z, BC20Z & LC17Z
| Project ID | WW05ISP56 |
| Project Name | 2005-06 WW Collection System Inspection |
| Description | This project includes inspection in the referenced wastewater sub-basins located over the Edward's Aquifer Recharge Zone. This is part of a State of Texas mandated wastewater system rehabilitation program overseen by the Texas Commission on Environmental Quality (TCEQ). The inspection includes analyzing videotape from the cleaning and televising, as well as, smoke and flood-dye testing to find significant infiltration and inflow (I&I) sources. All of the sources are then quantified in a final report. |
| Budget | $130,000 |
| Project Manager | David Freireich |
| Status | | Project Phase | | Estimated Completion | | Land Acquisition | | | | Design | | |  | Construction | | November 2007 | |
|
| Architect | |
| Engineer | RJN Group, Inc. |
| Construction Contractor | |
| Project Maps | |