The East Water Transmission Line Phase 3B-1 improvements will construct 16,900 feet of 36" water line from FM 1460 east along CR 112 to 117, then south on CR 117 to Kiphen Road. This line is needed to deliver water to the Paloma MUD and to meet future water demands in the east and southeast areas of Round Rock.