2012 Regional Wastewater Interceptor CCTV, Sonar, and Laser Inspection
Project ID
WW056REGINTR
Project Name
2012 Regional Wastewater Interceptor CCTV, Sonar, and Laser Inspection
Description
This regional project with the Brushy Creek Regional Wastewater System (BCRWWS) consists of performing Closed Circuit TV, Sonar, and Laser Inspection of the regional wastewater interceptors located over the Edwards Aquifer Recharge Zone (EARZ). Information from the inspection will be analyzed and recommendations for repairs will be made if necessary. The interceptors over the aquifer range from 24 to 84 inches in diameter with a combined approximate total length of 41,288 linear feet. The pipe, located over the EARZ, is required to be inspected every five years per TCEQ Edwards Aquifer Rules (30 TAC Chapter 213).