This project continues the City's efforts to provide reuse water to the developing Northeast area of Round Rock. This project includes the design of a 1.25 million gallon Elevated Water Storage Tank and the extension of the Reuse Waterline. The waterline will extend 900 feet from the end of Phase IV-A, currently in design with Baker-Aiklen as part of the College Park Drive Improvements, to the reuse tank site. The tank will provide 1.25 million gallons of elevated storage capacity for the Reuse Water System to help control pressure in the system. In addition, a 3 MGD high-service pump will be added to the existing 9 MGD pump station at the Reuse Water Treatment Facility.