<?xml version="1.0" encoding="UTF-8" ?>
<?xml-stylesheet type="text/xsl" href="http://roundrocktexas.gov/cc/utility/FeedStylesheets/rss.xsl" media="screen"?><rss version="2.0" xmlns:dc="http://purl.org/dc/elements/1.1/" xmlns:slash="http://purl.org/rss/1.0/modules/slash/" xmlns:wfw="http://wellformedweb.org/CommentAPI/"><channel><title>Search results matching tag 'Parks and Recreation'</title><link>http://roundrocktexas.gov/cc/search/SearchResults.aspx?o=DateDescending&amp;tag=Parks+and+Recreation&amp;orTags=0</link><description>Search results matching tag 'Parks and Recreation'</description><dc:language>en-US</dc:language><generator>CommunityServer 2007.1 (Build: 21119.1142)</generator><item><title>Family Campout at Old Settlers Park!</title><link>http://roundrocktexas.gov/cc/blogs/events/archive/2012/09/04/family-campout-at-old-settlers-park.aspx</link><pubDate>Tue, 04 Sep 2012 14:47:00 GMT</pubDate><guid isPermaLink="false">9be1e196-b4dd-4219-b883-7e290dbe3f82:1313</guid><dc:creator>Roger Heaney</dc:creator><description>&lt;p&gt;The City of Round Rock&amp;#39;s &lt;a href="http://www.roundrocktexas.gov/parksandrec/"&gt;Parks and Recreation Department&lt;/a&gt; presents the &lt;a href="http://www.roundrocktexas.gov/home/index.asp?page=1850"&gt;Outdoor Family Campout&lt;/a&gt; on Friday and Saturday, Sept. 21 and 22, 2012 at &lt;a href="http://www.roundrocktexas.gov/home/index.asp?page=1552"&gt;Old Settlers Park&lt;/a&gt;.&lt;a href="http://roundrocktexas.gov/cc/blogs/events/Family%20Campout%20Logo%202011.JPG"&gt;&lt;img style="WIDTH:205px;HEIGHT:241px;" border="0" hspace="2" alt="" align="right" src="http://roundrocktexas.gov/cc/blogs/events/Family%20Campout%20Logo%202011.JPG" width="1706" height="2214" /&gt;&lt;/a&gt;&lt;/p&gt;
&lt;p&gt;&lt;strong&gt;Come Camp with us in Old Settlers Park!&lt;br /&gt;&lt;/strong&gt;It is said that a family that plays together stays together. Is there a better way to create lasting memories than through camping, fishing or other similar activities? We don’t think so; however, fewer families are enjoying these activities, the outdoors, and each other. &lt;/p&gt;
&lt;p&gt;The Outdoor Family Campout can help provide basic outdoor skills necessary for an enjoyable and successful outdoor experience. More importantly, it shows families how fun the outdoors can be.&amp;nbsp; The campout will lead into &lt;a href="http://www.kidsoutdoorzone.com/Get%20Started.htm"&gt;National Hunting and Fishing Day&lt;/a&gt;.&amp;nbsp; &lt;/p&gt;
&lt;p&gt;Activities include rock climbing, lawn games, a reptile and wildlife demonstration, tent decorating contest and more! The campout will lead into National Hunting and Fishing Day.&lt;/p&gt;
&lt;p&gt;Registration for the campout is required and each person attending must be registered.&amp;nbsp; Children ages 2 and under are free and do not need to register.&amp;nbsp; Registration fee includes two meals (hamburger/hot dog dinner on Friday and breakfast on Saturday), instructional how-to sessions, use of demonstration equipment and a t-shirt for each paid participant. Register now at &lt;a href="http://www.roundrockrecreation.com/"&gt;www.roundrockrecreation.com&lt;/a&gt;.&lt;/p&gt;
&lt;p&gt;The Family Campout is sponsored by &lt;a href="http://www.rei.com/stores/round-rock.html"&gt;REI&lt;/a&gt;, &lt;a href="http://www.wagabag.com/"&gt;Wag A Bag&lt;/a&gt; and &lt;a href="http://www.nextcare.com/index.php/locations/location/round_rock/"&gt;Nextcare&lt;/a&gt;.&lt;/p&gt;</description></item><item><title>The Dolphin Tale Experince coming to &amp;quot;Movies in the Park&amp;quot; Friday night!</title><link>http://roundrocktexas.gov/cc/blogs/events/archive/2012/08/07/the-dolphin-tale-experince-coming-to-quot-movies-in-the-park-quot-friday-night.aspx</link><pubDate>Tue, 07 Aug 2012 13:41:00 GMT</pubDate><guid isPermaLink="false">9be1e196-b4dd-4219-b883-7e290dbe3f82:1276</guid><dc:creator>Roger Heaney</dc:creator><description>&lt;p&gt;The finale in this summer’s &lt;a href="http://www.roundrocktexas.gov/home/index.asp?page=1432"&gt;“Movies in the Park”&lt;/a&gt; series may be the best one yet. In a partnership with &lt;a href="http://www.hanger.com/prosthetics/experience/patientprofiles/winterthedolphin/Pages/WintertheDolphin.aspx"&gt;Hanger, Inc.,&lt;/a&gt; the City of Round Rock brings you an interactive experience of the real Dolphin Tale story. On Friday, August 10, the Round Rock Parks and Recreation Department presents Dolphin Tale on a large, 50&lt;a href="http://roundrocktexas.gov/cc/blogs/events/Dolphin%20Tale.jpg"&gt;&lt;img style="width:184px;height:263px;" border="1" hspace="2" alt="" align="right" src="http://roundrocktexas.gov/cc/blogs/events/Dolphin%20Tale.jpg" width="436" height="843" /&gt;&lt;/a&gt; foot blowup movie screen in Old Settlers Park. Hanger, Inc., the company that makes the prosthetic, has relocated to Austin and will be present at the movie to allow everyone to view the original prosthetic tail and ask any questions about the project. The event will begin at 7:30pm.&lt;/p&gt;
&lt;p&gt;It’s the story of a dolphin named Winter who was caught in a crab trap. She was freed, but was forced to part with her tail. When her story reached prosthetist Kevin Carroll, the vice president of prosthetics at Hanger, Inc. and volunteer at the Clearwater Marine Aquarium, he and fellow prosthetist Dan Strzempka developed the world’s first prosthetic tail to replace the entire tail fluke of a dolphin. Along with the development of the prosthetic tail came the creation of something else, called WintersGel, that originally worked to protect Winter’s delicate skin and prevent the tail from slipping. WintersGel is now used as a liner to provide comfort for human amputees who need additional cushioning due to bony spurs or challenging amputations. For more than five years now, Carroll and Strzempka have volunteered their nights and weekends to the Clearwater Marine Aquarium to fabricate a series of tails for Winter as she grows and develops.&lt;/p&gt;
&lt;p&gt;Let the story of a brave little dolphin and her human angels captivate and inspire you. Bring the entire family out to Old Settlers Park at 7:30 pm to partake in the interactive Dolphin Tale Experience. There will be giveaways and a video of Winter working with her trainer as well as an up-close look at Winter’s first prosthetic tail. Representatives from Hanger, Inc. will be on site to answer questions and provide more information.&lt;/p&gt;
&lt;p&gt;As always, feel free to bring blankets and chairs to make yourself comfortable. This will be a perfect night for a family picnic in the park. Kona Ice will also be on site with their signature treats.&lt;/p&gt;
&lt;p&gt;For more information on this event, please visit &lt;a href="http://www.roundrocktexas.gov/parksandrec"&gt;http://www.roundrocktexas.gov/parksandrec&lt;/a&gt;. To learn more about Winter’s story, visit &lt;a href="http://www.hanger.com/winterthedolphin"&gt;http://www.hanger.com/winterthedolphin&lt;/a&gt;. You can also view Winter’s live webcam feed at &lt;a href="http://www.seewinter.com/"&gt;http://www.seewinter.com&lt;/a&gt;. &lt;br /&gt;&lt;/p&gt;</description></item><item><title>Parks Develoment Updates Issue #6</title><link>http://roundrocktexas.gov/cc/blogs/rocker/archive/2012/03/27/parks-develoment.aspx</link><pubDate>Tue, 27 Mar 2012 16:52:00 GMT</pubDate><guid isPermaLink="false">9be1e196-b4dd-4219-b883-7e290dbe3f82:1207</guid><dc:creator>Roger Heaney</dc:creator><description>&lt;p&gt;&lt;strong&gt;&lt;u&gt;&lt;a href="http://www.roundrocktexas.gov/playforall"&gt;Play for All Abilities Park&lt;/a&gt;&lt;/u&gt;&lt;/strong&gt; - Project Complete (March 2012)&lt;br /&gt;Now open!&lt;/p&gt;&lt;iframe src="http://www.youtube.com/embed/EsSARdE-_Wo?rel=0&amp;amp;theme=light" frameborder="0" width="425" height="349" allowfullscreen=""&gt;&lt;/iframe&gt;
&lt;p&gt;&lt;strong&gt;&lt;u&gt;&lt;a href="http://www.roundrocktexas.gov/home/index.asp?page=1543"&gt;Rock Hollow Park&lt;/a&gt;&lt;/u&gt;&lt;/strong&gt;&amp;nbsp; -&amp;nbsp; Project Complete (March 2012)&lt;br /&gt;Now open!&lt;/p&gt;&lt;iframe src="http://www.youtube.com/embed/scKDBGo8isA?rel=0&amp;amp;theme=light" frameborder="0" width="425" height="349" allowfullscreen=""&gt;&lt;/iframe&gt;
&lt;p&gt;&lt;u&gt;&lt;strong&gt;&lt;a href="http://www.roundrocktexas.gov/home/index.asp?page=1514"&gt;Buck Egger Park&lt;/a&gt;&lt;/strong&gt;&lt;/u&gt;&amp;nbsp; -&amp;nbsp; Project Complete&lt;br /&gt;Opening in April!&lt;/p&gt;&lt;iframe src="http://www.youtube.com/embed/du5gXRHM1eM?rel=0&amp;amp;theme=light" frameborder="0" width="425" height="349" allowfullscreen=""&gt;&lt;/iframe&gt;
&lt;p&gt;&lt;strong&gt;&lt;u&gt;&lt;a href="http://www.roundrocktexas.gov/home/index.asp?page=1538"&gt;Somerset Park&lt;br /&gt;&lt;/a&gt;&lt;/u&gt;&lt;/strong&gt;Status:&amp;nbsp; Construction (90% Complete)&lt;br /&gt;Est. Completion:&amp;nbsp; March 2012&lt;br /&gt;Park Amenities:&amp;nbsp; renovation of playground, concrete trail, shade structure, site furnishings (picnic tables, benches, drinking fountains) and possible basketball court&lt;/p&gt;
&lt;p&gt;&lt;em&gt;Current Project Progress &lt;br /&gt;&lt;/em&gt;Playground equipment installed, 95% of sidewalk installed, pavilion installed, basketball court 95% complete&lt;br /&gt;Need to install site furnishings, playground surfacing, surface basketball court, and finish remaining sidewalk&lt;/p&gt;&lt;iframe src="http://www.youtube.com/embed/R45Q96tTgFg?rel=0&amp;amp;theme=light" frameborder="0" width="425" height="349" allowfullscreen=""&gt;&lt;/iframe&gt;
&lt;p&gt;&lt;strong&gt;&lt;u&gt;&lt;a href="http://www.roundrocktexas.gov/home/index.asp?page=1530"&gt;Chisholm Valley Park&lt;br /&gt;&lt;/a&gt;&lt;/u&gt;&lt;/strong&gt;Status:&amp;nbsp; Construction (90% complete)&lt;br /&gt;Est. Completion:&amp;nbsp; March 2012&lt;br /&gt;&lt;br /&gt;Park Amenities:&amp;nbsp; renovation of playground, shade structure, +/- ½ mile of concrete trail, multipurpose rec field, site furnishings (picnic tables, benches, drinking fountains), trees&lt;/p&gt;
&lt;p&gt;&lt;em&gt;Current Project Progress&lt;/em&gt; &lt;br /&gt;Playground area 95% complete, concrete sidewalks 95% complete, decomposed granite trail is based, multipurpose field is graded, pavilion is installed&lt;br /&gt;Need to pour concrete curbs and install decomposed granite trail, install playground surfacing, site furnishings, install masonry columns on pavilion &lt;/p&gt;&lt;iframe src="http://www.youtube.com/embed/NDhbszhQNWs?rel=0&amp;amp;theme=light" frameborder="0" width="425" height="349" allowfullscreen=""&gt;&lt;/iframe&gt;
&lt;p&gt;&lt;strong&gt;Rabb House Redevelopment Project&lt;br /&gt;&lt;/strong&gt;Status:&amp;nbsp; Design&lt;br /&gt;Est. Completion:&amp;nbsp; Design - Spring 2012&lt;/p&gt;
&lt;p&gt;Park Amenities:&amp;nbsp; design and construction documents for the redevelopment of Rabb House (damaged in September 2010 flood)&lt;/p&gt;
&lt;p&gt;&lt;em&gt;Current Project Progress &lt;br /&gt;&lt;/em&gt;Conceptual Master Plan is completed, will be presented to City Council on April 10th&lt;/p&gt;
&lt;p&gt;&lt;strong&gt;OSPV Reuse Water Project&lt;br /&gt;&lt;/strong&gt;Status:&amp;nbsp; Design&lt;br /&gt;Est. Completion:&amp;nbsp; Summer 2012&lt;/p&gt;
&lt;p&gt;Park Amenities:&amp;nbsp; removal/replacement of existing irrigation system valves, heads, etc. to comply with reuse water requirements.&amp;nbsp; Renovation of existing irrigation system at Lakeview Pavilion area, Football Complex, Cricket Field, etc.&lt;/p&gt;
&lt;p&gt;&lt;em&gt;Current Project Progress &lt;br /&gt;&lt;/em&gt;Utility Dept. to start mainline work and point of connections in April&lt;br /&gt;Compliance repairs and time sensitive renovations tentatively scheduled for late Spring 2012&lt;br /&gt;Major renovations tentatively scheduled for June/July 2012&lt;/p&gt;
&lt;p&gt;&lt;strong&gt;Kensington Greenbelt Improvement Project&lt;br /&gt;&lt;/strong&gt;Status:&amp;nbsp; Design&lt;br /&gt;Est. Completion:&amp;nbsp; Design - May 2012&lt;br /&gt;Construction – September 2012&lt;/p&gt;
&lt;p&gt;Park Amenities:&amp;nbsp; replacement of existing trail, playground, site furnishings and addition of pavilion structure&lt;/p&gt;
&lt;p&gt;&lt;strong&gt;Mesa Village Improvement Project&lt;br /&gt;&lt;/strong&gt;Status:&amp;nbsp; Planning&lt;br /&gt;Est. Completion:&amp;nbsp; Design – May 2012&lt;br /&gt;Construction – October 2012&lt;/p&gt;
&lt;p&gt;Park Amenities:&amp;nbsp; replace existing asphalt trail with decomposed granite, replace existing pavilion, and improvements to existing multipurpose field&lt;/p&gt;
&lt;p&gt;&lt;strong&gt;Brushy Creek Regional Trail Gap Project&lt;br /&gt;&lt;/strong&gt;Status:&amp;nbsp; Design and Right-of-Way Acquisition&lt;br /&gt;Est. Completion:&amp;nbsp; Spring 2013&lt;/p&gt;
&lt;p&gt;Park Amenities:&amp;nbsp; +/- 2.5 miles of Brushy Creek Trail from Sonoma subdivision, across Brushy Creek, connecting to Rabb Park and AW Grimes Blvd multi-use path.&amp;nbsp; Also connects to Greater Lake Creek Trail totaling approx. 7 miles.&lt;/p&gt;
&lt;p&gt;&lt;em&gt;Current Project Progress &lt;br /&gt;&lt;/em&gt;R.O.W. acquisition negotiations on-going&lt;br /&gt;Surveying and environmental review on-going&amp;nbsp;&lt;br /&gt;&lt;/p&gt;</description></item><item><title>Parks Development Updates Issue #5</title><link>http://roundrocktexas.gov/cc/blogs/rocker/archive/2011/12/13/parks-development-updates-issue-5.aspx</link><pubDate>Tue, 13 Dec 2011 21:25:00 GMT</pubDate><guid isPermaLink="false">9be1e196-b4dd-4219-b883-7e290dbe3f82:1175</guid><dc:creator>Roger Heaney</dc:creator><description>&lt;p&gt;&lt;b&gt;Settlement Park:&lt;/b&gt; Project completed.&lt;br /&gt;Take a look at the completed project:&lt;br /&gt;
&lt;iframe src="http://www.youtube.com/embed/PNez87PvVMk?rel=0&amp;amp;theme=light" allowfullscreen="" frameborder="0" height="349" width="425"&gt;&lt;/iframe&gt;
&lt;br /&gt;&lt;b&gt;&lt;u&gt;&lt;a href="http://www.roundrocktexas.gov/playforall"&gt;&lt;/a&gt;&lt;/u&gt;&lt;/b&gt;&lt;/p&gt;

&lt;p&gt;&lt;b&gt;&lt;u&gt;&lt;a href="http://www.roundrocktexas.gov/playforall"&gt;Play for All Abilities Park&lt;br /&gt;&lt;/a&gt;&lt;/u&gt;&lt;/b&gt;&lt;i&gt;Status:&lt;/i&gt;&amp;nbsp; Under Construction (70% complete)&lt;br /&gt;Est. Completion:&amp;nbsp; January 2012&lt;br /&gt;&lt;br /&gt;&lt;i&gt;Park Amenities:&lt;/i&gt;&amp;nbsp; park for children and adults of all abilities, including Large Playscape Pod, Retreat Pod, Rock Band Pod, Sensory Pod, Swing Area, and Village Pod.&amp;nbsp; Each pod was designed specifically with children with disabilities in mind to ensure the pods offered valuable developmental, social, and recreation opportunities for children of all abilities.&lt;/p&gt;&lt;p&gt;&lt;i&gt;Current Project Progress: &lt;br /&gt;&lt;/i&gt;&lt;/p&gt;&lt;ul&gt;&lt;li&gt;90% of concrete work is completed&lt;/li&gt;&lt;li&gt;Playground equipment for Large Playscape Pod, Sensory Play Pod, and Swing Area is installed&lt;/li&gt;&lt;li&gt;Poured-in-place surfacing to be installed in mid-December&lt;/li&gt;&lt;li&gt;Trees to be planted mid-December&lt;/li&gt;&lt;li&gt;Fence installation to start late December&lt;/li&gt;&lt;/ul&gt;&lt;p&gt;&lt;/p&gt;
&lt;iframe src="http://www.youtube.com/embed/4YoJTtiUBhM?rel=0&amp;amp;theme=light" allowfullscreen="" frameborder="0" height="349" width="425"&gt;&lt;/iframe&gt;
&lt;p&gt;&lt;b&gt;&lt;u&gt;&lt;a href="http://www.roundrocktexas.gov/home/index.asp?page=1514"&gt;Buck Egger Park&lt;br /&gt;&lt;/a&gt;&lt;/u&gt;&lt;/b&gt;&lt;i&gt;Status:&lt;/i&gt;&amp;nbsp; Construction (50% complete)&lt;br /&gt;Est. Completion:&amp;nbsp; February 2012&lt;br /&gt;&lt;br /&gt;&lt;i&gt;Park Amenities:&lt;/i&gt;&amp;nbsp; parking lot, synthetic turf multipurpose field, and grass multipurpose field&lt;br /&gt;&lt;/p&gt;&lt;p&gt;&lt;i&gt;Current Project Progress&lt;/i&gt;: &lt;br /&gt;&lt;/p&gt;&lt;ul&gt;&lt;li&gt;Parking lot and sidewalk complete&lt;/li&gt;&lt;li&gt;Chemical stabilization near completion&lt;/li&gt;&lt;li&gt;Synthetic turf field scheduled to be completed by end of year&lt;/li&gt;&lt;li&gt;Natural grass field scheduled to be completed by mid-January&lt;/li&gt;&lt;/ul&gt;&lt;p&gt;&lt;/p&gt;

&lt;iframe src="http://www.youtube.com/embed/GVvL90TYr90?rel=0&amp;amp;theme=light" allowfullscreen="" frameborder="0" height="349" width="425"&gt;&lt;/iframe&gt;

&lt;p&gt;&lt;b&gt;&lt;u&gt;&lt;a href="http://www.roundrocktexas.gov/home/index.asp?page=1543"&gt;Rock Hollow Park&lt;br /&gt;&lt;/a&gt;&lt;/u&gt;&lt;/b&gt;&lt;i&gt;Status:&lt;/i&gt;&amp;nbsp; Construction (80% complete)&lt;br /&gt;Est. Completion:&amp;nbsp; January 2012&lt;br /&gt;&lt;br /&gt;&lt;i&gt;Park Amenities:&lt;/i&gt;&amp;nbsp; +/- ½ mile of concrete trail replacing existing asphalt trail, ADA accessibility improvements&lt;br /&gt;&lt;br /&gt;&lt;i&gt;Current Project Progress: &lt;/i&gt;&lt;b&gt;&lt;br /&gt;&lt;/b&gt;&lt;/p&gt;&lt;ul&gt;&lt;li&gt;Approx. 80% of concrete trail installed &lt;/li&gt;&lt;li&gt;Construction should be complete by Christmas&lt;/li&gt;&lt;li&gt;Tree planting tentatively scheduled for January&lt;/li&gt;&lt;/ul&gt;&lt;p&gt;&lt;/p&gt;

&lt;iframe src="http://www.youtube.com/embed/Cs1AnQvcV2I?rel=0&amp;amp;theme=light" allowfullscreen="" frameborder="0" height="349" width="425"&gt;&lt;/iframe&gt;

&lt;p&gt;&lt;b&gt;&lt;u&gt;&lt;a href="http://www.roundrocktexas.gov/home/index.asp?page=210"&gt;Clay Madsen Recreation Center&lt;br /&gt;&lt;/a&gt;&lt;/u&gt;&lt;/b&gt;Check out the final improvements to the center:&lt;/p&gt;


&lt;iframe src="http://www.youtube.com/embed/zVvGZC40hRk?rel=0&amp;amp;theme=light" allowfullscreen="" frameborder="0" height="349" width="425"&gt;&lt;/iframe&gt;

&lt;p&gt;&lt;br /&gt;&lt;b&gt;Municipal Office Complex (MOC) Plaza&lt;u&gt;&lt;br /&gt;&lt;/u&gt;&lt;/b&gt;&lt;i&gt;Status:&lt;/i&gt;&amp;nbsp; Under Design (delayed due to re-design of Brown/Florence Street Improvements)&lt;br /&gt;Est. Completion:&amp;nbsp; Design – November 2011&lt;br /&gt;Construction – August/September 2012&lt;br /&gt;&lt;br /&gt;&lt;i&gt;Park Amenities:&lt;/i&gt;&amp;nbsp; concrete plaza, performance lawn, areas designed for street festivals, “pillars of the community”, secondary performance stage/shade structure, amphitheater overlook/bat viewing area, improvements to amphitheater, electrical system for street festivals, landscape areas, Brown/Florence Street Improvements, MOC parking lot improvements&lt;br /&gt;&lt;br /&gt;&lt;i&gt;Current Project Progress&lt;/i&gt;&lt;b&gt;: &lt;br /&gt;&lt;/b&gt;&lt;/p&gt;&lt;ul&gt;&lt;li&gt;95% plans completed, awaiting re-design of Brown/Florence Street&lt;/li&gt;&lt;li&gt;TCEQ WPAP revision to be submitted in January/February timeframe, 3-4 month review&lt;/li&gt;&lt;/ul&gt;&lt;p&gt;&lt;/p&gt;
&lt;p&gt;&lt;b&gt;Rabb Park/Brushy Creek Trail Restroom Building&lt;u&gt;&lt;br /&gt;&lt;/u&gt;&lt;/b&gt;&lt;i&gt;Status:&lt;/i&gt;&amp;nbsp; Construction&lt;br /&gt;Est. Completion:&amp;nbsp; January 2012&lt;br /&gt;&lt;br /&gt;&lt;i&gt;Park Amenities:&lt;/i&gt;&amp;nbsp; Building with 3 unisex, accessible restrooms&lt;br /&gt;&lt;br /&gt;&lt;i&gt;Current Project Progress:&lt;/i&gt;&lt;b&gt; &lt;br /&gt;&lt;/b&gt;&lt;/p&gt;&lt;ul&gt;&lt;li&gt;Site utilities installed&lt;/li&gt;&lt;li&gt;MEP rough-in complete&lt;/li&gt;&lt;li&gt;Slab to be poured next week&lt;/li&gt;&lt;/ul&gt;&lt;p&gt;&lt;/p&gt;
&lt;p&gt;&lt;b&gt;OSPV Triple Crown Complex Restroom Building&lt;u&gt;&lt;br /&gt;&lt;/u&gt;&lt;/b&gt;&lt;i&gt;Status:&lt;/i&gt;&amp;nbsp; Construction&lt;br /&gt;Est. Completion:&amp;nbsp; Design – October 2011&lt;br /&gt;Construction – January 2012&lt;br /&gt;&lt;br /&gt;&lt;i&gt;Park Amenities:&lt;/i&gt;&amp;nbsp; 4-6 stall restroom building, site utilities and sidewalks&lt;br /&gt;&lt;br /&gt;&lt;i&gt;Current Project Progress&lt;/i&gt;&lt;b&gt;&lt;i&gt;:&lt;/i&gt;&lt;br /&gt;&lt;/b&gt;&lt;/p&gt;&lt;ul&gt;&lt;li&gt;Contract awarded by City Council on November 22nd &lt;/li&gt;&lt;li&gt;Construction to start mid-December&lt;/li&gt;&lt;/ul&gt;&lt;p&gt;&lt;/p&gt;
&lt;p&gt;&lt;b&gt;&lt;u&gt;&lt;a href="http://www.roundrocktexas.gov/home/index.asp?page=1524"&gt;Memorial Park Bridge Repair&lt;br /&gt;&lt;/a&gt;&lt;/u&gt;&lt;/b&gt;&lt;i&gt;Status:&lt;/i&gt;&amp;nbsp; Construction&amp;nbsp; (75% complete)&lt;br /&gt;Est. Completion:&amp;nbsp; December 2011&lt;br /&gt;&lt;br /&gt;&lt;i&gt;Park Amenities:&lt;/i&gt;&amp;nbsp; Repair 100’ pedestrian bridge crossing Brushy Creek that was damaged in September 2010 flood&lt;br /&gt;&lt;br /&gt;&lt;i&gt;Current Project Progress: &lt;/i&gt;&lt;b&gt;&lt;br /&gt;&lt;/b&gt;&lt;/p&gt;&lt;ul&gt;&lt;li&gt;Steel beams and railings have been replaced&lt;/li&gt;&lt;li&gt;Finish welding to be complete next week&lt;/li&gt;&lt;li&gt;Decking to be installed over next two weeks&lt;/li&gt;&lt;/ul&gt;&lt;p&gt;&lt;/p&gt;
&lt;p&gt;&lt;b&gt;&lt;u&gt;&lt;a href="http://www.roundrocktexas.gov/home/index.asp?page=1538"&gt;Somerset Park&lt;br /&gt;&lt;/a&gt;&lt;/u&gt;&lt;/b&gt;&lt;i&gt;Status:&lt;/i&gt;&amp;nbsp; Construction (10% Complete)&lt;br /&gt;Est. Completion:&amp;nbsp; February 2012&lt;br /&gt;&lt;br /&gt;&lt;i&gt;Park Amenities:&lt;/i&gt;&amp;nbsp; renovation of playground, concrete trail, shade structure, site furnishings (picnic tables, benches, drinking fountains) and possible basketball court&lt;/p&gt;&lt;p&gt;&lt;i&gt;Current Project Progress&lt;/i&gt;: &lt;br /&gt;&lt;/p&gt;&lt;ul&gt;&lt;li&gt;Demolition and removal of all existing amenities is complete&lt;/li&gt;&lt;li&gt;Rough grading work underway&lt;/li&gt;&lt;/ul&gt;&lt;p&gt;&lt;/p&gt;
&lt;p&gt;&lt;b&gt;&lt;u&gt;&lt;a href="http://www.roundrocktexas.gov/home/index.asp?page=1530"&gt;Chisholm Valley Park&lt;br /&gt;&lt;/a&gt;&lt;/u&gt;&lt;/b&gt;&lt;i&gt;Status:&lt;/i&gt;&amp;nbsp; Construction (15% complete)&lt;br /&gt;Est. Completion:&amp;nbsp; February 2012&lt;br /&gt;&lt;br /&gt;&lt;i&gt;Park Amenities:&lt;/i&gt;&amp;nbsp; renovation of playground, shade structure, +/- ½ mile of concrete trail, multipurpose rec field, site furnishings (picnic tables, benches, drinking fountains), trees&lt;br /&gt;&lt;br /&gt;&lt;i&gt;Current Project Progress: &lt;/i&gt;&lt;b&gt;&lt;br /&gt;&lt;/b&gt;&lt;/p&gt;&lt;ul&gt;&lt;li&gt;Demolition and removal of existing amenities complete&lt;/li&gt;&lt;li&gt;Rough grading is underway&lt;/li&gt;&lt;/ul&gt;&lt;p&gt;&lt;/p&gt;
&lt;p&gt;&lt;b&gt;Rabb House Redevelopment Project&lt;u&gt;&lt;br /&gt;&lt;/u&gt;&lt;/b&gt;&lt;i&gt;Status:&lt;/i&gt;&amp;nbsp; Design&lt;br /&gt;Est. Completion:&amp;nbsp; Design - Spring 2012&lt;br /&gt;&lt;br /&gt;&lt;i&gt;Park Amenities:&lt;/i&gt;&amp;nbsp; design and construction documents for the redevelopment of Rabb House (damaged in September 2010 flood)&lt;br /&gt;&lt;br /&gt;&lt;i&gt;Current Project Progress: &lt;/i&gt;&lt;b&gt;&lt;br /&gt;&lt;/b&gt;&lt;/p&gt;&lt;ul&gt;&lt;li&gt;Architectural agreement finalized and to be authorized at January 12th City Council Meeting &lt;/li&gt;&lt;/ul&gt;&lt;p&gt;&lt;/p&gt;
&lt;p&gt;&lt;b&gt;OSPV Reuse Water Project&lt;u&gt;&lt;br /&gt;&lt;/u&gt;&lt;/b&gt;&lt;i&gt;Status:&lt;/i&gt;&amp;nbsp; Design&lt;br /&gt;Est. Completion:&amp;nbsp; Spring 2012&lt;br /&gt;&lt;br /&gt;&lt;i&gt;Park Amenities:&lt;/i&gt;&amp;nbsp; removal/replacement of existing irrigation system valves, heads, etc. to comply with reuse water requirements.&amp;nbsp; Renovation of existing irrigation system at Lakeview Pavilion area, Football Complex, Cricket Field, etc.&lt;br /&gt;&lt;br /&gt;&lt;i&gt;Current Project Progress: &lt;/i&gt;&lt;b&gt;&lt;br /&gt;&lt;/b&gt;&lt;/p&gt;&lt;ul&gt;&lt;li&gt;Utility Dept. to start mainline work and point of connections late-December or early January&lt;/li&gt;&lt;li&gt;Compliance repairs and time sensitive renovations tentatively scheduled for January 2012&lt;/li&gt;&lt;li&gt;Major renovations tentatively scheduled for Feb/March 2012&lt;/li&gt;&lt;/ul&gt;&lt;p&gt;&lt;/p&gt;
&lt;p&gt;&lt;b&gt;Kensington Greenbelt Improvement Project&lt;u&gt;&lt;br /&gt;&lt;/u&gt;&lt;/b&gt;&lt;i&gt;Status:&lt;/i&gt;&amp;nbsp; Design&lt;br /&gt;Est. Completion:&amp;nbsp; Design - March 2012&lt;br /&gt;Construction – September 2012&lt;br /&gt;&lt;br /&gt;&lt;i&gt;Park Amenities:&lt;/i&gt;&amp;nbsp; replacement of existing trail, playground, site furnishings and addition of pavilion structure&lt;/p&gt;
&lt;p&gt;&lt;b&gt;&lt;u&gt;&lt;a href="http://www.roundrocktexas.gov/home/index.asp?page=1536"&gt;Mesa Village Improvement Project&lt;br /&gt;&lt;/a&gt;&lt;/u&gt;&lt;/b&gt;&lt;i&gt;Status:&lt;/i&gt;&amp;nbsp; Planning&lt;br /&gt;Est. Completion:&amp;nbsp; Design – May 2012&lt;br /&gt;Construction – October 2012&lt;br /&gt;&lt;br /&gt;&lt;i&gt;Park Amenities:&lt;/i&gt;&amp;nbsp; replace existing asphalt trail with decomposed granite, replace existing pavilion, and improvements to existing multipurpose field&lt;/p&gt;
&lt;p&gt;&lt;b&gt;Brushy Creek Regional Trail Gap Project&lt;u&gt;&lt;br /&gt;&lt;/u&gt;&lt;/b&gt;&lt;i&gt;Status:&lt;/i&gt;&amp;nbsp; On-hold&lt;br /&gt;Est. Completion:&amp;nbsp; Spring 2013&lt;br /&gt;&lt;br /&gt;&lt;i&gt;Park Amenities:&lt;/i&gt;&amp;nbsp; +/- 2.5 miles of Brushy Creek Trail from Sonoma subdivision, across Brushy Creek, connecting to Rabb Park and AW Grimes Blvd multi-use path.&amp;nbsp; Also connects to Greater Lake Creek Trail totaling approx. 7 miles.&lt;br /&gt;&lt;i&gt;&lt;/i&gt;&lt;/p&gt;&lt;p&gt;&lt;i&gt;Current Project Progress&lt;/i&gt;: &lt;br /&gt;&lt;/p&gt;&lt;ul&gt;&lt;li&gt;R.O.W. acquisition negotiations on-going&lt;/li&gt;&lt;/ul&gt;&lt;p&gt;&lt;/p&gt;
</description></item><item><title>Parks Development Updates Issue #3</title><link>http://roundrocktexas.gov/cc/blogs/rocker/archive/2011/08/26/parks-development-updates-issue-3.aspx</link><pubDate>Fri, 26 Aug 2011 16:00:00 GMT</pubDate><guid isPermaLink="false">9be1e196-b4dd-4219-b883-7e290dbe3f82:1129</guid><dc:creator>Roger Heaney</dc:creator><description>&lt;p&gt;Construction has continued around town and many projects are coming along quite nicely. As the &lt;a href="http://www.roundrocktexas.gov/parksandrec/"&gt;Parks and Recreation Department&lt;/a&gt; has met with community members, new projects have been added to enhance various features around the city. Check out all of our ongoing projects below for the latest updates.&lt;/p&gt;
&lt;p&gt;&lt;b&gt;&lt;u&gt;&lt;a href="http://www.roundrocktexas.gov/playforall"&gt;Play for All Abilities Park&lt;/a&gt; &lt;br /&gt;&lt;/u&gt;Status:&lt;/b&gt;&amp;nbsp; Under Construction&lt;br /&gt;&lt;b&gt;Est. Completion:&lt;/b&gt;&amp;nbsp; December 2011&lt;br /&gt;&lt;b&gt;Park Amenities:&lt;/b&gt;&amp;nbsp; park for children and adults of all abilities, including Large Playscape Pod, Retreat Pod, Rock Band Pod, Sensory Pod, Swing Area, and Village Pod.&amp;nbsp; Each pod was designed specifically with children with disabilities in mind to ensure the pods offered valuable developmental, social, and recreation opportunities for children of all abilities. &lt;br /&gt;&lt;br /&gt;&lt;b&gt;Current Project Progress: &lt;br /&gt;&lt;/b&gt;Water and wastewater utilities installed (Thank you Public Works!)&lt;br /&gt;Overhead electric line and service starting construction&lt;br /&gt;Site work contractor to start in 1-2 weeks&lt;/p&gt;
&lt;iframe src="http://www.youtube.com/embed/etN6v6ODaa8?rel=0" allowfullscreen="" frameborder="0" height="349" width="425"&gt;&lt;/iframe&gt;
&lt;p&gt;&lt;b&gt;Main Street Plaza (&lt;/b&gt;221 East Main Street next to City Hall)&lt;br /&gt;&lt;b&gt;Status:&lt;/b&gt;&amp;nbsp; Under Construction&lt;br /&gt;&lt;b&gt;Est. Completion:&lt;/b&gt;&amp;nbsp; September &lt;a href="http://www.roundrocktexas.gov/home/index.asp?page=9&amp;amp;recordid=16497"&gt;(Grand Opening Celebration October 1st)&lt;br /&gt;&lt;/a&gt;&lt;b&gt;Park Amenities:&lt;/b&gt;&amp;nbsp; interactive water feature, art screens (along Nelson Hardware Building), stage, shade structure, seatwalls, active light system, concrete plaza, landscape areas&lt;br /&gt;&lt;br /&gt;&lt;b&gt;Current Project Progress: &lt;br /&gt;&lt;/b&gt;Shade structure concrete piers installed (25’ deep)&lt;br /&gt;Interactive fountain piping and storage tank installed&lt;br /&gt;90% of masonry complete (seatwalls, signs, stage)&lt;br /&gt;Electrical conduit (6,000 linear feet of conduit in ground) and panels installed)&lt;br /&gt;All utilities installed &lt;br /&gt;Starting concrete flatwork&lt;/p&gt;
&lt;iframe src="http://www.youtube.com/embed/zkvI2yszLJo?rel=0" allowfullscreen="" frameborder="0" height="349" width="425"&gt;&lt;/iframe&gt;
&lt;p&gt;&lt;b&gt;Municipal Office Complex (MOC) Plaza&lt;/b&gt; (Located behind the &lt;a href="http://www.roundrocktexas.gov/home/index.asp?page=213"&gt;Baca Center&lt;/a&gt; and the McConico building)&lt;br /&gt;&lt;b&gt;Status:&lt;/b&gt;&amp;nbsp; Under Design&lt;br /&gt;&lt;b&gt;Est. Completion:&lt;/b&gt;&amp;nbsp; Design – November 2011&lt;br /&gt;&lt;b&gt;Construction&lt;/b&gt; – March/April 2012&lt;br /&gt;&lt;b&gt;Park Amenities:&lt;/b&gt;&amp;nbsp; Concrete plaza, performance lawn, areas designed for street festivals, “pillars of the community”, secondary performance stage/shade structure, amphitheater overlook/bat viewing area, improvements to amphitheater, electrical system for street festivals, landscape areas, Brown/Florence Street Improvements, MOC parking lot improvements&lt;br /&gt;&lt;br /&gt;&lt;b&gt;Current Project Progress: &lt;br /&gt;&lt;/b&gt;90% plans under review&lt;br /&gt;TCEQ WPAP revision to be submitted in August, 3-4 month review time&lt;br /&gt;&lt;a href="http://roundrocktexas.gov/cc/blogs/rocker/MOC-Plaza.jpg"&gt;&lt;img src="http://roundrocktexas.gov/cc/blogs/rocker/MOC-Plaza.jpg" alt="" border="0" height="419" width="469" /&gt;&lt;/a&gt;&lt;/p&gt;
&lt;p&gt;&lt;b&gt;&lt;u&gt;&lt;a href="http://www.roundrocktexas.gov/home/index.asp?page=1537"&gt;Settlement Park&lt;br /&gt;&lt;/a&gt;&lt;/u&gt;Status:&lt;/b&gt;&amp;nbsp; Under Construction&lt;br /&gt;&lt;b&gt;Est. Completion:&lt;/b&gt;&amp;nbsp; October 2011&lt;br /&gt;&lt;b&gt;Park Amenities:&lt;/b&gt;&amp;nbsp; renovation of playground, concrete trail, retaining wall, wood privacy fence, shade structure, pond aerator, ADA accessibility improvements, trees&lt;br /&gt;&amp;nbsp;&lt;br /&gt;&lt;b&gt;Current Project Progress: &lt;br /&gt;&lt;/b&gt;Demo of existing amenities complete&lt;br /&gt;First section of trail installed&lt;br /&gt;Fence replacement underway&lt;br /&gt;Playground area grading complete&lt;/p&gt;
&lt;iframe src="http://www.youtube.com/embed/J3CjeqE_bpA?rel=0" allowfullscreen="" frameborder="0" height="349" width="425"&gt;&lt;/iframe&gt;
&lt;p&gt;&lt;b&gt;Rabb Park / Brushy Creek Trail Restroom Building&lt;u&gt;&lt;br /&gt;&lt;/u&gt;Status:&lt;/b&gt;&amp;nbsp; Bid and Award&lt;br /&gt;&lt;b&gt;Est. Completion:&lt;/b&gt;&amp;nbsp; December 2011&lt;br /&gt;&lt;b&gt;Park Amenities:&lt;/b&gt;&amp;nbsp; Building with 3 unisex accessible restrooms&lt;br /&gt;&lt;br /&gt;&lt;b&gt;Current Project Progress: &lt;br /&gt;&lt;/b&gt;Design complete&lt;br /&gt;Bid project in August&lt;/p&gt;
&lt;p&gt;&lt;b&gt;&lt;a href="http://www.roundrocktexas.gov/home/index.asp?page=1552"&gt;Old Settlers Park&lt;/a&gt;&amp;nbsp;Triple Crown Restroom Building&lt;u&gt;&lt;br /&gt;&lt;/u&gt;Status:&lt;/b&gt;&amp;nbsp; Under Design&lt;br /&gt;&lt;b&gt;Est. Completion:&lt;/b&gt;&amp;nbsp; Design – October 2011&lt;br /&gt;&lt;b&gt;Construction&lt;/b&gt; – January 2012&lt;br /&gt;&lt;b&gt;Park Amenities:&lt;/b&gt;&amp;nbsp; 4-6 stall restroom building, site utilities and sidewalks&lt;br /&gt;&lt;br /&gt;&lt;b&gt;Current Project Progress:&lt;br /&gt;&lt;/b&gt;Architects agreement to be awarded August 5th &lt;/p&gt;
&lt;p&gt;&lt;b&gt;&lt;u&gt;&lt;a href="http://www.roundrocktexas.gov/home/index.asp?page=1524"&gt;Memorial Park Bridge Repair&lt;br /&gt;&lt;/a&gt;&lt;/u&gt;Status:&lt;/b&gt;&amp;nbsp; Bid and Award&lt;br /&gt;&lt;b&gt;Est. Completion:&lt;/b&gt;&amp;nbsp; November 2011&lt;br /&gt;&lt;b&gt;Park Amenities:&lt;/b&gt;&amp;nbsp; repair 100’ pedestrian bridge crossing Brushy Creek that was damaged in September 2010 flood&lt;br /&gt;&lt;br /&gt;&lt;b&gt;Current Project Progress:&lt;u&gt; &lt;br /&gt;&lt;/u&gt;&lt;/b&gt;Bid opening on August 9th&lt;br /&gt;Construction to begin late September&lt;/p&gt;
&lt;p&gt;&lt;b&gt;&lt;u&gt;&lt;a href="http://www.roundrocktexas.gov/home/index.asp?page=1543"&gt;Rock Hollow Park&lt;br /&gt;&lt;/a&gt;&lt;/u&gt;Status:&lt;/b&gt;&amp;nbsp; Bid and Award&lt;br /&gt;&lt;b&gt;Est. Completion:&lt;/b&gt;&amp;nbsp; December 2011&lt;br /&gt;&lt;b&gt;Park Amenities:&lt;/b&gt;&amp;nbsp; ½ mile of concrete trail replacing existing asphalt trail, ADA accessibility improvements&lt;br /&gt;&lt;br /&gt;&lt;b&gt;Current Project Progress: &lt;br /&gt;&lt;/b&gt;Bid opening on August 9th&lt;br /&gt;Construction to begin late September&lt;/p&gt;
&lt;p&gt;&lt;b&gt;&lt;u&gt;&lt;a href="http://www.roundrocktexas.gov/home/index.asp?page=1538"&gt;Somerset Park&lt;br /&gt;&lt;/a&gt;&lt;/u&gt;Status:&lt;/b&gt;&amp;nbsp; Bid and Award&lt;br /&gt;&lt;b&gt;Est. Completion:&lt;/b&gt;&amp;nbsp; January 2012&lt;br /&gt;&lt;b&gt;Park Amenities:&lt;/b&gt;&amp;nbsp; Renovation of playground, concrete trail, shade structure, site furnishings (picnic tables, benches, drinking fountains) and possible basketball court&lt;br /&gt;&lt;br /&gt;&lt;b&gt;Current Project Progress:&lt;/b&gt; &lt;br /&gt;Bid opening on August 16th&lt;br /&gt;Construction to begin late September&lt;/p&gt;
&lt;p&gt;&lt;b&gt;&lt;u&gt;&lt;a href="http://www.roundrocktexas.gov/home/index.asp?page=1530"&gt;Chisholm Valley Park&lt;br /&gt;&lt;/a&gt;&lt;/u&gt;Status:&lt;/b&gt;&amp;nbsp; Bid and Award&lt;br /&gt;&lt;b&gt;Est. Completion:&lt;/b&gt;&amp;nbsp; January 2012&lt;br /&gt;&lt;b&gt;Park Amenities:&lt;/b&gt;&amp;nbsp; Renovation of playground, shade structure, ½ mile of concrete trail, multipurpose rec field, site furnishings (picnic tables, benches, drinking fountains), trees&lt;br /&gt;&lt;br /&gt;&lt;b&gt;Current Project Progress: &lt;br /&gt;&lt;/b&gt;Bid opening on August 22nd &lt;br /&gt;Construction to begin late September – early November&lt;/p&gt;
&lt;p&gt;&lt;b&gt;&lt;u&gt;&lt;a href="http://www.roundrocktexas.gov/home/index.asp?page=1514"&gt;Buck Egger Park&lt;br /&gt;&lt;/a&gt;&lt;/u&gt;Status:&lt;/b&gt;&amp;nbsp; Bid and Award&lt;br /&gt;&lt;b&gt;Est. Completion:&lt;/b&gt;&amp;nbsp; January 2012&lt;br /&gt;&lt;b&gt;Park Amenities:&lt;/b&gt;&amp;nbsp; parking lot, synthetic turf multipurpose field, and grass multipurpose field&lt;br /&gt;&lt;br /&gt;&lt;b&gt;Current Project Progress: &lt;br /&gt;&lt;/b&gt;Bid opening on August 22nd &lt;br /&gt;Construction to begin late September – early November&lt;/p&gt;
&lt;p&gt;&lt;b&gt;&lt;u&gt;&lt;a href="http://www.roundrocktexas.gov/home/index.asp?page=348#brushycreekgap"&gt;Brushy Creek Regional Trail Gap Project&lt;br /&gt;&lt;/a&gt;&lt;/u&gt;Status:&lt;/b&gt;&amp;nbsp; On-hold&lt;br /&gt;&lt;b&gt;Est. Completion:&lt;/b&gt;&amp;nbsp; Spring 2013&lt;br /&gt;&lt;b&gt;Park Amenities:&lt;/b&gt;&amp;nbsp; +/- 2.5 miles of Brushy Creek Trail from Sonoma subdivision, across Brushy Creek, connecting to Rabb Park and AW Grimes Blvd multi-use path.&amp;nbsp; Also connects to Greater Lake Creek Trail totaling approx. 7 miles.&lt;br /&gt;&lt;br /&gt;&lt;b&gt;Current Project Progress: &lt;br /&gt;&lt;/b&gt;R.O.W. acquisition negotiations on-going&lt;/p&gt;
&lt;p&gt;&lt;b&gt;Rabb House Redevelopment Conceptual Plan&lt;u&gt;&lt;br /&gt;&lt;/u&gt;Status:&lt;/b&gt;&amp;nbsp; RFQ &lt;br /&gt;&lt;b&gt;Est. Completion:&lt;/b&gt;&amp;nbsp; Spring 2012&lt;br /&gt;&lt;b&gt;Park Amenities:&lt;/b&gt;&amp;nbsp; conceptual plan for the redevelopment of Rabb House (damaged in September 2010 flood)&lt;br /&gt;&lt;br /&gt;&lt;b&gt;Current Project Progress: &lt;br /&gt;&lt;/b&gt;RFQ’s for architectural services to be sent out week of August 15th&amp;nbsp; &lt;br /&gt;Architect selected by October&lt;/p&gt;</description></item><item><title>Parks Development Updates Issue #2</title><link>http://roundrocktexas.gov/cc/blogs/rocker/archive/2011/07/21/parks-development-updates-issue-2.aspx</link><pubDate>Thu, 21 Jul 2011 16:25:00 GMT</pubDate><guid isPermaLink="false">9be1e196-b4dd-4219-b883-7e290dbe3f82:1110</guid><dc:creator>Roger Heaney</dc:creator><description>&lt;p&gt;Construction has continued around town and many projects are coming along quite nicely. As the Parks and Recreation Department has met with community members, new projects have been added to enhance various features around the city.&lt;/p&gt;
&lt;p&gt;&lt;b&gt;Chisholm Valley Park&lt;br /&gt;&lt;/b&gt;Located in the Chisholm Valley housing development, &lt;a href="http://www.roundrocktexas.gov/home/index.asp?page=1530"&gt;Chisholm Valley Park&lt;/a&gt; spans 3.32 acres and includes a shelter, picnic areas, grills, one playscape, and a practice field. A Public Input Meeting was held on July 13 about the Chisholm Valley Park improvements. Funding is already in place for the removal and replacement of several park amenities. Currently, the focus is on new playground equipment and a walking trail. Pending funding, future plans may also include a multipurpose field, sand volleyball court, and a basketball court.&lt;/p&gt;
&lt;p&gt;&lt;b&gt;Rock Hollow Trail&lt;br /&gt;&lt;/b&gt;&lt;a href="http://www.roundrocktexas.gov/home/index.asp?page=1543"&gt;Rock Hollow Park&lt;/a&gt; spans 12.52 acres and includes 0.44 miles of trail. Also in the park are picnic areas, grills, and two playscapes. The grounds are located inside the Chandler Creek neighborhood and the amenities offer multiple options for outdoor recreation and play.&lt;br /&gt;A Public Input Meeting was held on July 12 to discuss the improvements to Rock Hollow Trail. The objective of the improvements is to re-align the trail in a few areas to allow for better access to park features and to improve the current intersections and connectivity. Funding is already in place to remove and replace the existing trail throughout the park.&lt;/p&gt;
&lt;p&gt;&lt;b&gt;Clay Madsen Recreation Center&lt;br /&gt;&lt;/b&gt;The &lt;a href="http://www.roundrocktexas.gov/home/index.asp?page=210"&gt;Clay Madsen Recreation Center&lt;/a&gt; was closed for part of last month as basketball and racquetball courts as well as floors throughout the building were refurbished. This month, the weight room received an important and state-of-the-art equipment upgrade. The weight room was closed for one week as all of the old equipment and flooring was removed, recycled rubber fitness flooring was added, and brand new equipment from Precor was installed. All of the equipment in the room looks streamlined and modern. As an added bonus, the hallways throughout the building received a finished coat to make them extra shiny. And they finished everything in less time than they had planned!&lt;/p&gt;&lt;iframe src="http://www.youtube.com/embed/b5SHmOBuYP0?rel=0" allowfullscreen="" frameborder="0" height="349" width="425"&gt;&lt;/iframe&gt;
&lt;p&gt;&lt;b&gt;Play for All Abilities Park&lt;br /&gt;&lt;/b&gt;A park designed for children of all ages and abilities – who could have thought of that? A family who has a child with a disability and has had trouble in the past finding a park suitable for their child to play in, that’s who. The &lt;a href="http://www.roundrocktexas.gov/playforall"&gt;Play for All Abilities Park&lt;/a&gt; has been designed for children of all abilities to play in side-by-side without hindrance. And construction has already begun!&lt;br /&gt;&lt;br /&gt;Construction continues at the park as workers lay down utilities and electrical lines.&amp;nbsp; All the brush has been cleared away from the area and the next project will be grading of the site and earth work.&lt;/p&gt;
&lt;p&gt;&lt;b&gt;Main Street Plaza&lt;br /&gt;&lt;/b&gt;Lying adjacent to the City Hall building, this construction project is intended to create a friendly, green environment and be family focused. The goal is to bring art and culture together with interactive and imaginative play and education as well as use for rest and relaxation during the day.&lt;br /&gt;&lt;br /&gt;The next two weeks will be busy for the workers at the Main Street Plaza site. Scheduled to go up are the stage, shade structure poles, fountain pumps, and art screens. Also in the works are the sidewalks and seats built into the walls for convenient comfort. &lt;/p&gt;&lt;iframe src="http://www.youtube.com/embed/kKwwfZ20NZU?rel=0" allowfullscreen="" frameborder="0" height="349" width="425"&gt;&lt;/iframe&gt;
&lt;p&gt;&lt;b&gt;MOC Plaza (Municipal Office Complex)&lt;br /&gt;&lt;/b&gt;The MOC plaza is located behind the McConico Building and next to the Allen R Baca Center, an area of Round Rock that is largely office and retail. This plaza will create a space for workers to enjoy and relax on breaks and for patrons to use before/after their visits to the surrounding establishments. The MOC Plaza will also provide a place to hold events such as the Juneteenth celebration, music and theater performances, farmers market, etc.&amp;nbsp; Additionally, the plaza could be rented out for family reunions and weddings.&lt;br /&gt;&lt;br /&gt;The design plans for the MOC Plaza are 90% completed and awaiting approval. Below is what the plaza should look like when it is completed in Spring of 2012.&lt;br /&gt;&lt;a href="http://roundrocktexas.gov/cc/blogs/rocker/MOC-Plaza.jpg"&gt;&lt;img src="http://roundrocktexas.gov/cc/blogs/rocker/MOC-Plaza.jpg" border="0" height="419" width="469" alt="" /&gt;&lt;/a&gt;&lt;br /&gt;&lt;/p&gt;
&lt;p&gt;&lt;a href="http://roundrocktexas.gov/cc/blogs/rocker/MOC%20Plaza.jpg"&gt;&lt;/a&gt;&lt;/p&gt;
&lt;p&gt;&lt;b&gt;Settlement Park&lt;br /&gt;&lt;/b&gt;Construction started at &lt;a href="http://www.roundrocktexas.gov/home/index.asp?page=1537"&gt;Settlement Park&lt;/a&gt; on Thursday, July 14. Plans for the park include replacing the playground, trail, and fence and adding a fountain in the pond and a pavilion. This project is funded by the Repair and Replacement Program and Park Development Fund.&lt;/p&gt;
&lt;p&gt;&lt;b&gt;Summerset Park&lt;br /&gt;&lt;/b&gt;Located near Old Town Meadows and Peach Tree Valley neighborhoods, &lt;a href="http://www.roundrocktexas.gov/home/index.asp?page=1538"&gt;Summerset Park&lt;/a&gt; spans 9.61 acres and includes 0.41 miles of trail, picnic facilities with grills, and a playscape. The playscape looks a little lonely out there, so improvements and additions are in the works.&lt;br /&gt;The plans are 100% completed for Summerset Park and have all been approved. Bidding for the improvements will begin in August.&lt;/p&gt;
&lt;p&gt;&lt;b&gt;Buck Egger Park&lt;br /&gt;&lt;/b&gt;Near downtown Round Rock, &lt;a href="http://www.roundrocktexas.gov/home/index.asp?page=1514"&gt;Buck Egger Park&lt;/a&gt; has a playscape, swings, and a practice soccer field/football field. The 3.08 acre park is a fun play area for kids throughout the city.&lt;br /&gt;&lt;br /&gt;Plans are completed for Buck Egger’s new parking lot and synthetic turf. This project is funded by the commercial Block Grant. Bidding will begin the week of July 25th and construction is scheduled to begin in September.&lt;/p&gt;
&lt;p&gt;&lt;b&gt;Triple Crown Complex Restrooms&lt;br /&gt;&lt;/b&gt;If you’ve spent much time at the &lt;a href="http://www.roundrocktexas.gov/home/index.asp?page=1573"&gt;Old Settlers Park baseball fields&lt;/a&gt;, you know that the Triple Crown Complex is the only baseball diamond in the park without indoor plumbing. The complex has port-a-cans and there has long been a movement to get them replaced with restrooms. Well, here we go!&lt;br /&gt;Concept designs are complete for the new restrooms at the Triple Crown Complex. Construction will begin soon and the restrooms should be open by the end of the year.&lt;br /&gt;&lt;/p&gt;</description></item><item><title>Parks Development Updates Issue #1</title><link>http://roundrocktexas.gov/cc/blogs/rocker/archive/2011/06/17/parks-development-updates-issue-1.aspx</link><pubDate>Fri, 17 Jun 2011 15:30:00 GMT</pubDate><guid isPermaLink="false">9be1e196-b4dd-4219-b883-7e290dbe3f82:1098</guid><dc:creator>Roger Heaney</dc:creator><description>&lt;p&gt;Currently, the &lt;a href="http://www.roundrocktexas.gov/parksandrec/"&gt;Parks and Recreation Department&lt;/a&gt; has so many construction projects going on that it’s probably hard for everyone to keep up with it all... But we know that you want to!&lt;/p&gt;&lt;p&gt;Every month, this blog will be updated with current information on the different construction projects around town – what’s been going on, what still needs to be done, how close we are to finishing, any changes that have been made to the design along the way, etc. Keep checking back here to stay updated on all the projects that you care about. We&amp;#39;ll even offer you video updates on some projects as they are coming along!&lt;/p&gt;
&lt;p&gt;&lt;b&gt;Clay Madsen Recreation Center&lt;u&gt;&lt;br /&gt;&lt;/u&gt;&lt;/b&gt;The &lt;a href="http://www.roundrocktexas.gov/home/index.asp?page=210"&gt;Clay Madsen Recreation Center&lt;/a&gt; has been under construction lately as different portions of the building get refurbished and revitalized. The floors in the hallways, basketball courts, and racquetball courts were resurfaced so now they are smooth and shiny. New logos were painted on the courts for the City of Round Rock and the Sports Capital of Texas.&lt;br /&gt;&lt;br /&gt;&lt;b&gt;The center will be closed for another round of updates on July 9th and 10th. An additional finish coat will be added to the hallway floors and the weight room floors and equipment will be replaced. This is great news as CMRC will have state-of-the-art equipment for your enjoyment once completed.&lt;/b&gt;&lt;/p&gt;
&lt;iframe src="http://www.youtube.com/embed/3z7GmKoUS6s?rel=0" allowfullscreen="" frameborder="0" height="349" width="425"&gt;&lt;/iframe&gt;

&lt;p&gt;&lt;b&gt;&lt;br /&gt;&lt;/b&gt;&lt;b&gt;Play for All Abilities Park&lt;/b&gt;&lt;u&gt;&lt;b&gt;&lt;br /&gt;&lt;/b&gt;&lt;/u&gt;A park designed for children of all ages and abilities – who could have thought of that? A family who has a child with a disability and has had trouble in the past finding a park suitable for their child to play in, that’s who. The &lt;a href="http://www.roundrocktexas.gov/playforall"&gt;Play for All Abilities Park&lt;/a&gt; has been designed for children of all abilities to play in side-by-side without hindrance. And construction has already begun!&lt;br /&gt;&lt;br /&gt;The groundbreaking ceremony for the Play for All Abilities Park went smoothly, despite the rain, on May 19. Since then, the brush has been cleared away and the utilities and electrical lines have been laid down.&amp;nbsp; The next step in the project is to do some earth work. The Play for All Abilities Park is located at Rabb Park.&lt;/p&gt;
&lt;iframe src="http://www.youtube.com/embed/V9u1GEbKw3Y?rel=0" allowfullscreen="" frameborder="0" height="349" width="425"&gt;&lt;/iframe&gt;
&lt;p&gt;&amp;nbsp;&lt;/p&gt;
&lt;p&gt;&lt;b&gt;Main Street Plaza&lt;u&gt;&lt;br /&gt;&lt;/u&gt;&lt;/b&gt;Lying adjacent to the City Hall building, this construction project is intended to create a friendly, green environment and be family focused. The goal is to bring art and culture together with interactive and imaginative play and education as well as use for rest and relaxation during the day.&lt;br /&gt;&lt;br /&gt;The ground for the plaza has been graded and utilities have been laid. The next steps are to drill piers for the shade structure and begin plumbing work for the interactive water fountain. The plaza is expected to be completed in August 2011.&lt;/p&gt;
&lt;p&gt;&lt;a href="http://roundrocktexas.gov/cc/blogs/rocker/Main%20Street%20Plaza.pdf"&gt;Check out the Main Street Plaza design&lt;/a&gt; (&lt;a href="http://roundrocktexas.gov/cc/blogs/rocker/Main%20Street%20Plaza.pdf"&gt;PDF&lt;/a&gt;)&lt;/p&gt;
&lt;iframe src="http://www.youtube.com/embed/HOpOjwitW00?rel=0" allowfullscreen="" frameborder="0" height="349" width="425"&gt;&lt;/iframe&gt;
&lt;p&gt;&lt;b&gt;MOC Plaza (Municipal Office Complex)&lt;u&gt;&lt;br /&gt;&lt;/u&gt;&lt;/b&gt;The MOC plaza is located behind the McConico Building and next to the &lt;a href="http://www.roundrocktexas.gov/home/index.asp?page=213"&gt;Allen R Baca Center&lt;/a&gt;, an area of Round Rock that is largely office and retail. This plaza will create a space for workers to enjoy and relax on breaks and for patrons to use before/after their visits to the surrounding establishments. The MOC Plaza will also provide a place to hold events such as the Juneteenth celebration, music and theater performances, farmers market, etc.&amp;nbsp; Additionally, the plaza could be rented out for family reunions, weddings, etc. There is already an abundance of parking in the area, providing for easy access to the plaza. The design plans for the MOC Plaza have been updated and are approximately 60% finished – including seating, shade, lighting, and art pieces that could be permanent or rotated. Construction is scheduled to start this fall and completed in the spring of 2012.&lt;/p&gt;
&lt;p&gt;&lt;a href="http://roundrocktexas.gov/cc/blogs/rocker/MOC%20Plaza.pdf"&gt;Check out the MOC Plaza design&lt;/a&gt; (&lt;a href="http://roundrocktexas.gov/cc/blogs/rocker/MOC%20Plaza.pdf"&gt;PDF&lt;/a&gt;)&lt;a href="http://roundrocktexas.gov/cc/blogs/rocker/MOC%20Plaza.pdf"&gt;&lt;/a&gt;&lt;br /&gt;&lt;/p&gt;
&lt;p&gt;&lt;b&gt;Settlement Park&lt;u&gt;&lt;br /&gt;&lt;/u&gt;&lt;/b&gt;This park is already home to a playground, basketball court, and a pond. Over time, however, all things wear down and need some repair or replacing. With the help of the Repair and Replacement Program and the Park Development Fund, &lt;a href="http://www.roundrocktexas.gov/home/index.asp?page=1537"&gt;Settlement Park&lt;/a&gt; is being repaired and updated in order to remain a safe and enjoyable place for children and families. The playground, trail, and fence will be replaced and a fountain will be added to the pond. Also to be added to the park is a pavilion for shade, rest, and relaxation during a busy day of fun. Construction is scheduled to begin in July 2011.&lt;/p&gt;
&lt;p&gt;&lt;b&gt;Somerset Park&lt;u&gt;&lt;br /&gt;&lt;/u&gt;&lt;/b&gt;The design for &lt;a href="http://www.roundrocktexas.gov/home/index.asp?page=1538"&gt;Somerset Park&lt;/a&gt; is 90% completed and will include a playground, a trail, and a small pavilion. Currently, the city is working with Oncor Electric to get approval to begin construction in Oncor’s right-of-way.&lt;br /&gt;&lt;br /&gt;&lt;b&gt;Buck Egger Park&lt;u&gt;&lt;br /&gt;&lt;/u&gt;&lt;/b&gt;&lt;a href="http://www.roundrocktexas.gov/home/index.asp?page=1514"&gt;Buck Egger Park&lt;/a&gt; is already home to a playscape and a practice soccer/football field. Now it’s going to get a little more updated. With the help of Community Development Block Grant Funding, we are installing synthetic turf in the field and putting in a parking lot. Construction is scheduled to begin in the fall of 2011.&lt;/p&gt;
&lt;p&gt;&lt;b&gt;Triple Crown Complex Restrooms&lt;u&gt;&lt;br /&gt;&lt;/u&gt;&lt;/b&gt;If you’ve spent much time at the &lt;a href="http://www.roundrocktexas.gov/home/index.asp?page=1573"&gt;Old Settlers Park baseball fields&lt;/a&gt;, you know that the Triple Crown Complex is the only baseball diamond in the park without indoor plumbing. The complex has port-a-cans and there has long been a movement to get them replaced with restrooms. Well, here we go!&lt;br /&gt;We are currently in negotiations with the architect and have plans to begin the project in 6-8 weeks. Construction is scheduled to begin in fall 2011.&lt;/p&gt;</description></item><item><title>We're stylin' at the Baca Center</title><link>http://roundrocktexas.gov/cc/blogs/rocker/archive/2009/08/31/we-re-stylin-at-the-baca-center.aspx</link><pubDate>Mon, 31 Aug 2009 15:28:00 GMT</pubDate><guid isPermaLink="false">9be1e196-b4dd-4219-b883-7e290dbe3f82:608</guid><dc:creator>Terri Waggoner</dc:creator><description>&lt;p&gt;Come watch us strut our stuff on the catwalk!&amp;nbsp; The Allen R. Baca Center for Senior and Community Activities is hosting the Fall Fashion Show Friday, September 4 from 1 to 3 pm. At the fashion show, volunteer Baca Center models will have hair&amp;nbsp;and makeup done by Center member Kathleen Brown before they&amp;nbsp;model the lastest fashions from Coldwater Creek, JoS A. Banks and Stein Mart.&amp;nbsp;Along with the clothing companies, TXU energy and the Round Rock Express will be sponsoring the event.&amp;nbsp; &lt;/p&gt;
&lt;p&gt;The Round Rock Express is giving away free tickets for two separate games as door prizes.&amp;nbsp; Admission is free for members; walk-in rate of $1 for non-members. Call 512-218-5499 for more information.&amp;nbsp; Don&amp;#39;t miss the fun!&lt;/p&gt;</description></item><item><title>A/C out at Clay Madsen</title><link>http://roundrocktexas.gov/cc/blogs/rocker/archive/2009/08/24/a-c-out-at-clay-madsen.aspx</link><pubDate>Mon, 24 Aug 2009 13:51:00 GMT</pubDate><guid isPermaLink="false">9be1e196-b4dd-4219-b883-7e290dbe3f82:603</guid><dc:creator>Terri Waggoner</dc:creator><description>&lt;p&gt;Please note that the air conditioner at Clay Madsen Recreation Center went out on Saturday. The facility is still without air as we wait for the replacement&amp;nbsp;part to come in this week. Please schedule your workouts accordingly and we apologize for any inconvenience.&lt;/p&gt;
&lt;p&gt;CMRC is currently undergoing some renovations. Progress is still being made on the locker rooms and&amp;nbsp;the tennis courts were painted last week. When everything is done, the facility will look great! &lt;/p&gt;
&lt;p&gt;&amp;nbsp;&lt;/p&gt;</description></item><item><title>Construction in Old Settlers and Somerset Park</title><link>http://roundrocktexas.gov/cc/blogs/rocker/archive/2009/08/20/construction-in-old-settlers-and-somerset-park.aspx</link><pubDate>Thu, 20 Aug 2009 15:24:00 GMT</pubDate><guid isPermaLink="false">9be1e196-b4dd-4219-b883-7e290dbe3f82:600</guid><dc:creator>Elysabeth Bean</dc:creator><description>&lt;font face="Arial" size="2"&gt;&lt;span style="FONT-SIZE:10pt;FONT-FAMILY:Arial;"&gt;Over the next few months, Old Settlers Park and Somerset Park will be seeing some construction going on. Universal Field Systems will be working on the overhead electric lines in these parks. The initial work begins in the next couple weeks with the major construction scheduled to begin in the fall. &amp;nbsp;We will keep you posted as we receive more information about the construction schedule and details. &lt;/span&gt;&lt;/font&gt;</description></item></channel></rss>